4.5.1 Monitor And Control Project Work: Inputs Part 2 – 4.6 Perform Integrated Change Control Part 1

Please sign up for the course before starting the lesson.

Back to: PMP® Exam Prep Self-Guided – 6th Edition > Chapter 4: Project Integration Management